Allen & Overy

"Previous experience at Canary Wharf told me to have contracts manager Mark Roxburgh on-site throughout the installation," explains contracts director Paul Parry.
 

"A high level of co-ordination was imperative: security and logistics are tight, with deliveries to the new building restricted to pre-booked times. Missing your narrow slot has severe ramifications."
 

With no wall-fixing points along the glazed perimeter walls, kitchen equipment had to be secured between columns, the floor and ceiling, C&C's work with the fabricator made architect Gensler's modern, white corian services work.